A 1 kW turbine does not produce 1 kW. It produces about 2,000 kWh a year in a decent site, 800 kWh in a poor one, and almost nothing in a suburb. Here is the arithmetic behind that, so you can size a machine honestly.

Rated power is a wind speed, not an output

Every small turbine has a rated wind speed — usually 11 m/s — at which the generator reaches its nameplate figure. Below that, output falls with the cube of wind speed: at half the rated wind speed you get roughly one eighth of the rated power, not half.

That cubic relationship is the whole story of small wind. A site averaging 4 m/s and a site averaging 6 m/s differ by 50 % in wind speed but by more than 200 % in energy. It is why the annual mean wind speed at hub height is the only number worth arguing about before you buy.

Annual output by size and wind speed

Turbine4 m/s5 m/s6 m/s7 m/s
300 W300 kWh600 kWh1,050 kWh1,600 kWh
500 W500 kWh1,000 kWh1,750 kWh2,700 kWh
1 kW1,100 kWh2,000 kWh3,000 kWh4,200 kWh
2 kW2,200 kWh4,000 kWh6,000 kWh8,400 kWh
3 kW3,300 kWh6,000 kWh9,000 kWh12,600 kWh
5 kW5,500 kWh10,000 kWh15,000 kWh21,000 kWh
10 kW11,000 kWh20,000 kWh30,000 kWh42,000 kWh

These are gross figures at hub height for a well-sited machine with a good power curve, before inverter and battery losses (subtract 8–12 %). Treat them as a planning estimate, not a guarantee — a measured power curve and your own wind data beat any table.

Capacity factor: why 20 % is normal and 30 % is excellent

Dividing annual output by (rated power × 8,760 hours) gives the capacity factor. A 1 kW turbine producing 2,000 kWh a year runs at 23 %. Anything above 25 % means an excellent site and a well-matched rotor; below 15 % means the machine is too big for the wind you have.

This is also why buying a bigger turbine is a bad way to fix a low-wind site. A 5 kW machine on a 4 m/s site has a capacity factor near 12 % and produces less per dollar than a 2 kW machine on the same tower.

The seasonal shape matters as much as the total

In temperate climates, 60 % of annual wind energy arrives between October and March — exactly when solar produces least. That is the argument for wind-solar hybrid systems: the two sources are anti-correlated, so a combined system needs a much smaller battery than either alone.

In monsoon climates the pattern reverses and wind becomes a wet-season supplement. Ask for a monthly output table for your site before you commit; an annual total hides the three months when the machine does nothing.

Estimating your own site in ten minutes

Start with a wind atlas or a nearby airport mast for a first guess, then apply two corrections: height (wind rises about 10 % per doubling of height in open terrain) and obstacles (if a tree or building within 100 m is taller than the hub, expect 20–40 % less). If the result is below 4.5 m/s, stop and look at solar instead.

For anything above 1 kW, spend the money on a three-month measurement at hub height with a calibrated anemometer and a wind vane. It costs a few hundred dollars and it is the difference between a system that pays back and one that does not.

Frequently asked questions

Does a 1 kW turbine produce 1 kW all day?
No. It reaches 1 kW only around 11 m/s. Its average output over a year in a 5 m/s site is about 230 W — the equivalent of running continuously at a quarter of nameplate.
How many kWh does a 5 kW turbine produce per day?
About 27 kWh a day on average at 5 m/s, but the daily range is wide: 3 kWh in a calm spell, 90 kWh in a gale. A battery or grid connection is what turns that into usable supply.

Keep reading

Are Small Wind Turbines Worth It? Honest Payback Numbers

Yes on a windy farm with a real electricity bill. No on a suburban roof. The difference is not the turbine — it is the s…

Read more →

Wind Speed Requirements for a Small Wind Turbine

The number that matters is the annual mean wind speed at hub height. Here is the threshold, how to estimate it, and the …

Read more →

Tell us your wind speed and daily kWh

Send the site location and the load you need to power. You get a sized model, a price and a lead time — usually within one working day.

Request price & datasheet