Small wind turbine · 1 kW class
The first size that changes a household's electricity bill rather than just topping up a battery. A 2.4 m rotor and a 1 kW alternator produce about 2,000 kWh a year in a 5 m/s site — half a European home, or all of an efficient off-grid one.
The WT-1000H is where grid-tie becomes realistic. With the 1 kW inverter option the turbine synchronises to the local grid, exports surplus to the meter and shuts down within 200 ms if the grid disappears — the anti-islanding requirement every utility asks about.
On the battery side, a 48 V / 200 Ah lithium bank plus 1.5 kW of PV gives a cabin full autonomy in a mixed wind-solar climate. The controller can be set to prioritise wind at night and PV during the day without any manual switching.
| Parameter | Value |
|---|---|
| Peak power | 1.2 kW |
| Rated wind speed | 11 m/s |
| Cut-in wind speed | 2.8 m/s |
| Survival wind speed | 52 m/s |
| Rotor diameter | 2.4 m |
| Swept area | 4.52 m² |
| Blades | 3 × GFRP |
| Generator | Direct-drive PMG, 3-phase |
| Controller | MPPT 48 V / grid-tie 1 kW |
| Output | DC 48 V or AC 230 V |
| Tower | 9 m / 12 m |
| Nacelle protection | IP54 |
| Noise | ≤ 52 dB(A) @ 10 m |
| Design life | 20 years |
| Annual output (5 m/s mean) | ≈ 2,000 kWh |
| Warranty | 3 years (5 structural) |
Price depends on tower height, controller and battery bank — ask for a quote with your site details.
Puts the hub at 12 m, above the turbulent layer created by trees and single-storey roofs.
230 V / 50 Hz or 120 V / 60 Hz, THD below 4 %, certified to the islanding standard your utility requires.
Two independent overspeed systems; the brake can be triggered manually from the controller for storm shut-down.
RS485 output for rotor speed, DC voltage, current and cumulative kWh — readable from a PLC or our logger.
Cuts 1,500–2,500 kWh a year off the bill where net metering or self-consumption tariffs exist.
48 V system with 5–10 kWh of storage; the turbine carries the winter nights.
Irrigation pumps, cold rooms and workshop loads in rural areas with weak single-phase supply.
Send the site location and the load you need to power. You get a sized model, a price and a lead time — usually within one working day.